EV Ready Plan
Get a complete EV Ready Plan to future-proof your condo building and unlock EV charger rebates.
On-site electrical assessment
We inspect your building’s electrical system to evaluate current capacity and future EV charging potential.
Detailed load calculations
We calculate how much electrical load your system can handle to safely support EV charging infrastructure.
EV Ready Plan preparation
We provide a professional EV Ready Plan showing how your building can support EV chargers in every stall.
Rebate application assistance
We manage the rebate paperwork for you to maximize your funding with the EV Ready Plan rebate and other BC Hydro EV charger rebate programs.

What is an EV Ready Plan?
An EV Ready Plan is a detailed plan that outlines how a multi-unit residential building can support the future installation of EV charging stations by assessing the building’s electrical capacity, infrastructure, and parking layouts.
The plan will show how a building can provide at least one EV Ready parking space per residential unit in a building.
.jpg)
What is an EV Ready parking spot?
An EV Ready parking spot has a termination point (like a junction box or outlet) within five metres of the stall, making it easy to install a Level 2 EV charger when needed..
Key Features of an EV Ready Parking Spot:
- Power Available: Circuit and panel capacity are ready.
- Wired: Conduit and wiring are already in place.
- Breaker Installed: Ready to connect a charger.
- Charger-Ready: No further electrical upgrades needed.

Who Prepares the Plan?
Your EV Ready plan must be prepared by a licensed electrical contractor or a registered professional electrical engineer to qualify for BC Hydro EV charger rebate programs.
metroEV has the experience and technical expertise to design fully compliant EV Ready plans that meet rebate requirements and future-proof your building.

Why You Need a Plan Now
1. Unlock Funding Opportunities
If you want to apply for the BC Hydro EV Ready infrastructure rebate or BC Hydro EV charger rebate, an EV Ready Plan is required.
2. Increase Property Value and Appeal
Future-proof your building to meet rising EV demand. EV readiness makes your property more attractive to current and future residents.
3. Avoid expensive retrofits later
Planning for EV charging now saves you from costly electrical upgrades and disruptive construction in the future.
Get EV Ready with metroEV Step-by-Step Process
STEP 01
Book a Free Consultation
We’ll review your building’s needs and answer your questions to see if an EV Ready Plan is right for you.
STEP 02
Site Visit and Load Assessment
Our electrical team visits your property to assess your current electrical capacity and infrastructure.
STEP 03
Prepare the EV Ready Plan
We create a detailed, rebate compliant, engineer-approved plan that shows how your building can support EV chargers in all parking stalls.
STEP 04
Engineer Review
Your EV Ready Plan is reviewed, finalized, and professionally stamped to meet all regulatory and rebate requirements.
STEP 05
Rebate Support and Submission
We help you complete and submit your rebate applications to maximize your funding and ensure nothing is missed.
Get up to $3,000 back for your EV Ready plan, learn more about the EV Ready Plan rebate.
STEP 06
Delivery and Next Steps
You receive your completed EV Ready Plan along with clear recommendations for next steps and future installation.
-1.png)
EV Ready Plan Requirements: What Must Be Included?
BC Hydro’s rebate programs require your EV Ready Plan to cover five key areas:
1. Building Details
Includes information about your property, parking spaces, and the professional preparing the plan.
2. Electrical Capacity
Assesses your building’s existing electrical service, current power usage, and available capacity.
3. Charging Performance
Estimates the EV charging needs based on resident driving habits, climate, and building-specific factors.
4. Recommended EV Solution
Provides a detailed, scalable design for EV readiness, including power-sharing strategies, telecom needs, and service upgrade requirements.
5. Cost Estimates
Outlines the estimated costs for installation, upgrades, and equipment—all based on a single, preferred solution.

Start planning today
Book Your Free EV Ready Plan Consultation
metroEV can help you scope your project, develop an EV Ready Plan, and apply for available BC EV charger rebates. Fill out this form and our team will get back to you shortly.
Trusted by Property Managers & Strata Councils Across BC
We specialize in guiding condos, apartments, and MURBs through the entire EV charging installation process from start to finish.
Your building’s EV charging starts here— full service, no hassle and built for the future.
EV Ready Plan Development
Our licensed electrical contractors will prepare an EV Ready Plan to propose a recommended solution that meets rebate standards.
Rebate Application Assistance
Our team will guide you through eligibility and submission requirements to BC Hydro EV charger rebate programs, so you don't have to stress.
Turnkey EV Charging Solution
Our reliable EV charging solutions are designed for long-term growth to ensure success for your property as EV demand continues to rise.
Ongoing Support & Maintenance
Our team will continue to provide support and maintenance after installation to make sure your chargers remain in top working condition.
Commonly Asked Questions
Do I need an EV Ready Plan?
Yes, you will need an EV Ready Plan if you want to apply for EV charger rebates in BC or plan to install multiple chargers in the future.
What if my building is not ready for EV chargers right now?
That’s okay. An EV Ready Plan prepares your building for future EV charging by identifying what’s needed now and what can be added later, minimizing future costs and construction.
Learn more about condo EV charging solutions.
Can metroEV help with the installation after the EV Ready Plan is complete?
Yes. We offer full-service EV charger installation, including project management, permitting, equipment supply, and maintenance.
Contact metroEV to get a free, customized quote for your EV charger installation.
Is the EV Ready Plan mandatory in BC?
While the EV Ready Plan itself is not legally mandatory, it is required to access most EV charger rebates in BC and is strongly recommended to comply with evolving strata and municipal requirements.
How much does an EV Ready Plan cost?
metroEV offers a flat rate to create an EV Ready Plan. Apply for the BC Hydro EV Ready Plan rebate to get up to $3,000 to cover the cost of the plan.
Everything you need to get your building EV ready — simple, scalable, and fully managed by metroEV.

Rick W.


Drew W.


Doug van S.


Paul R.


D. W. Smith


Dianne D.

EV Charger Insights

Canada Announces EV Charger Incentive Program With Limited-time Funding
NRCan funds $1M in the EV Charger Incentive Program for EV chargers across Canada, with a focus on Ontario projects. Learn more about this 2025 announcement.

EV Charger Installation Checklist: A Timeline for Condo Boards
Looking to install EV chargers in your condo? Use this EV charger installation checklist to understand each phase of the project timeline—from consultation to activation—and how...

ChargeOn Funding Announcement 2025
The Ontario government adds $92M to the ChargeON Program, funding over 1,300 new EV charging ports. Learn more about this 2025 announcement.

BC Hydro EV Charger Rebate: Complete Guide for Condos, Workplaces and Homes
Learn about the BC Hydro EV charger rebate and how much funding and support you can receive on your next EV charger project.