121 Trudelle Street
EV Charging Infrastructure and Smart Station Installation
![](https://kajabi-storefronts-production.kajabi-cdn.com/kajabi-storefronts-production/file-uploads/themes/2154284052/settings_images/fbf47f-033b-328b-0275-077df142bc3d_121-Trudelle-Street-Unit-201-1.jpg)
About ThisĀ Project
SITE NAME
McCowan Place
SECTOR
Condo EV Charger Installation
JOB TYPE
EV Charging Infrastructure and Smart Station InstallationĀ
ADDRESS
121 Trudelle St, Scarborough, ON M1J 3K4
DESCRIPTION OF WORK
metroEV installed 20-unit infrastructure and 2 charging stations. The age of the building posed an interesting challenge as finding electrical components was not readily available.
PROPERTY OVERVIEW
There are 215 units at McCowan Place, with a variety of exposures and layouts over 17 levels.
![](https://kajabi-storefronts-production.kajabi-cdn.com/kajabi-storefronts-production/file-uploads/themes/2154043360/settings_images/cbebf01-eb85-63ca-eafd-14bf56a58c2e_electric-car.png)
121 Trudelle Street is reducing its Co2 emissions by 9 Metric Tons, equivalent to the carbon sequestered by 11 acres of forest in one year.*