Ambleside II
1171 Ambleside Dr, Ottawa, ON K2B 8E1
JOB TYPE
EV Charging Infrastructure and Smart Station Installation
30
charging stations
30
unit infrastructure
DESCRIPTION OF WORK
metroEV installed 30-unit infrastructure and 30 charging stations. The age of the building posed an interesting challenge as finding electrical components were not readily available. metroEV was able to obtain 50% funding from NRCan ZEVIP program.
PROPERTY OVERVIEW
Ambleside Two is the second of two similar complexes built by the Minto Corporation in the mid-1970s.
Ambleside II
is reducing its Co2 emissions by 135 metric tons, equivalent to the carbon sequestered by
160
acres of forest in one year.*
*Read more in epa.gov
You might also like...
RELATED PROJECTS
ON THE BLOG
EV Charger Insights
NEMA Enclosure Ratings: Why You Need an EV Charger with a NEMA 4 Rating in Canada
Learn what NEMA enclosure ratings mean, the differences between NEMA rated enclosure types, and why EV chargers in Canada require a weatherproof NEMA 4 enclosure.
EV Charging Migration in Condos: Can I Switch EV Charging Software?
Wondering if you can switch EV charging software? Learn how EV charging migration works, what it costs, and how metroEV makes switching providers seamless, compatible, and...
metroEV Joins the Canadian Charging Infrastructure Council to Support Canada’s EV Charging Growth
metroEV joins the Canadian Charging Infrastructure Council (CCIC) to help advance Canada’s EV charging network and support sustainable infrastructure growth.