Ambleside II

locatiob1171 Ambleside Dr, Ottawa, ON K2B 8E1

JOB TYPE
EV Charging Infrastructure and Smart Station Installation

Ambleside II
charging stations

30
charging stations

infrastructure

30
unit infrastructure

DESCRIPTION OF WORK

metroEV installed 30-unit infrastructure and 30 charging stations. The age of the building posed an interesting challenge as finding electrical components were not readily available. metroEV was able to obtain 50% funding from NRCan ZEVIP program.

PROPERTY OVERVIEW

Ambleside Two is the second of two similar complexes built by the Minto Corporation in the mid-1970s.

EV
Ambleside II

is reducing its Co2 emissions by 135 metric tons, equivalent to the carbon sequestered by
160 acres of forest in one year.*

*Read more in epa.gov

metroev team

Questions? We're here to help.

Speak with our EV experts

You might also like...

RELATED PROJECTS

ON THE BLOG

EV Charger InsightsEV Charger Insights

From Non-Functional to Future-Ready EV Charging: Case Study from Women’s College Hospital

Case Study

From Non-Functional to Future-Ready EV Charging: Case Study from Women’s College Hospital

Learn how Women’s College Hospital transformed a broken EV charging system into a fully functional, revenue-generating solution, and discover key lessons for facility managers.

Power Management System for EV Charging: 3 Ways Developers Can Save Money, Space, and Future Headaches

Condo EV Chargers

Power Management System for EV Charging: 3 Ways Developers Can Save Money, Space, and Future Headaches

Learn how power management systems for EV charging help developers design cost-efficient, scalable EV charging infrastructure and avoid costly oversizing.

Level 3 EV Charger: Everything You Need to Know About DC Fast Chargers

EV Chargers 101 Commercial EV Chargers

Level 3 EV Charger: Everything You Need to Know About DC Fast Chargers

Learn everything you need to know about a Level 3 EV charger, including how DC fast chargers works, where it's used, installation requirements, vehicle compatibility, and project...

Read More Articles